SITEMAP   PRIVACY   JAPANESE
FAWEB
  JAPAN   HOME  |  Product  |  Support  |  Knowledge  |  Download  |  Sales  |  Company  |  Contact
MELSEC

insideMELSEC
Inside MELSEC
Advanced OPC
Wonder World
You are Here : HOME > Knowledge Base > Inside MELSEC BACK

When the electric control should put like "Cobweb", grapple with the electric wiring that it is made to come round, and have the mechanism change before the cradle of PLC, an electrician appliances store is the one that it was made to cry because of the tester and one hand of the circuit chart. An epoch making product that advanced such Tuu and manufacturing at the high economic growth period appeared. It is a PLC. The heart on the production site where only the engineer who was well versed in electricity was able to put up his hand was expressed with software, and it came to be able to achieve work "Wiring" by "The picture is only written on graphic". As a result, it came to be able to correspond also to a complex control and the retooling that happened one after another not to mention the equipment start up period's having shortened in dramatic form easily.

By the way, what is the charm of PLC? Perhaps, do it become "Everyone understands"? Even an electrician appliances store and a software engineer shop were able to make the ladder, and even a mechanical engineer shop came to be able to read the movement of the written ladder to some degree recently. Moreover, it falls on the level with an unexpected price repeating mass production and reduction in costs now, and the processing speed goes up to the microcomputer board level. A lot of adhering to the function that doesn't understand well is also true, and it is true to have buried even the function to lose though "It reduces the price and the function is raised" becomes a natural age if it doesn't know.

Here, various functions of Mitsubishi Electric Corporation PLC "MELSEC" like a function not provided this year that has been heard up to now and a convenient function, etc. are dug down and it explains. It would be greatly appreciated of seeing as for resting time etc. if information that can be helped even a little could be offered.


Article List
2004/12/01 MELSEC-Q Series Redundancy CPU System
2004/07/21 Attractive FB (2)
2004/07/20 Attractive FB (1)
2004/07/16 How to use of the structure
2004/07/12 Ideal and reality of label programming
2004/06/03 ST language suitable for a complex operational expression (2)
2004/06/02 ST language suitable for a complex operational expression (1)
2001/03/26 Mail function
2001/02/19 Do you know? The FTP can be communicated with PLC
2001/01/05 The CSV file is made in PLC and the data collection
2000/12/24 Maintained bringing PLC in the factory together by using Ethernet!
2000/12/13 The ladder is not "One scroll" any longer

BACK

Copyright © 1998-2006 TAKEBISHI Corporation All rights reserved.

FAWEB.NET
TAKEBISHI Corporation
29 Mamedacho Nishikyogoku Ukyoku Kyoto 615-8501, JAPAN
TEL: +81-75-325-2171 / FAX: +81-75-325-2273 fa-support@takebishi.co.jp